Repository logo
 

Sustainable site clean-up from megaprojects: Lessons from London 2012


Change log

Authors

Hou, D 
Al-Tabbaa, A 
Hellings, J 

Abstract

jats:p The London 2012 Olympic and Paralympic Games are considered to have been a great success for the UK. In building the Olympic Park, another great achievement was the clean-up and reuse of a large area of contaminated land. A remediation project of this size would typically take 5 to 15 years to complete, but the project team completed the remediation work in less than 3 years. This study provides an in-depth examination of the remediation practices at the site, mainly from the perspective of sustainable construction. Data were collected from multiple sources, including project files, publications by various government agencies and non-governmental organisations, as well as qualitative interviews with project team members. The paper first presents a review of brownfield redevelopment and sustainable remediation literature. Sustainability initiatives and achievements in the Olympic Park site remediation project are summarised and discussed. These mainly included suitable remediation strategies, recycling and reuse of contaminated soil by using soil washing and innovative in situ remediation of contaminated groundwater through bioremediation. The paper identifies a number of challenges and lessons learned regarding brownfield remediation in megaprojects, which warrant further technological development and appropriate policy actions to address. </jats:p>

Description

Keywords

land reclamation, pollution, sustainability

Journal Title

Proceedings of the Institution of Civil Engineers: Engineering Sustainability

Conference Name

Journal ISSN

1478-4629
1751-7680

Volume Title

168

Publisher

Thomas Telford Ltd.
Sponsorship
Funding for this research was provided by the Cambridge International Scholarships Scheme (#10191612) which is gratefully acknowledged.